XM无法为美国居民提供服务。

Germany's Thyssenkrupp reviewing green steel production plans



<html xmlns="http://www.w3.org/1999/xhtml"><head><title>UPDATE 3-Germany's Thyssenkrupp reviews green steel production plans, shares fall</title></head><body>

Adds North Rhine-Westphalia in paragraph 8

FRANKFURT, Oct 7 (Reuters) -Germany's Thyssenkrupp TKAG.DE said on Monday it is reviewing its plans for the production of green steel, casting doubt over its ambitions to use hydrogen in its push to decarbonise what is one of the most polluting industrial processes.

Shares in the group were 4% lower following the comments, which highlight the challenges German industry faces in meeting emissions targets while staying competitive in a sector that suffers from high energy costs and cheaper products from Asian rivals.

"We are continuously examining the best and most economically viable solutions under the given conditions in terms of technology and results in order to make Thyssenkrupp's steel business climate-neutral in the long term," it said.

The comments came in response to a report in German business daily Handelsblatt, citing internal documents as saying the group was considering halting a 3 billion euro ($3.3 billion) hydrogen-based direct reduction project that forms the core of its decarbonisation strategy.

Thyssenkrupp Steel Europe (TKSE), in which Czech billionaire Daniel Kretinsky owns a 20% stake, already warned last month that the planned direct reduction site in Duisburg could cost more than initially expected.

Around 2 billion euros of the project's funding comes from the German government and the state of North Rhine-Westphalia, where Thyssenkrupp is based, and TKSE said possible cost increases had no impact on the subsidies.

Germany's Economy Ministry said the grant was tied to the necessary commitment of the recipient, adding it would continue to ensure that the commitment was met.

The economy minister for North Rhine-Westphalia, Mona Neubaur, said in a statement that North Rhine-Westphalia would reserve the right to claim back any funds already provided under the terms of the grant if the project was not realised.

Thyssenkrupp confirmed earlier statements saying that it currently assumed the site would be built.

TKSE is at loggerheads with parent Thyssenkrupp over how much money the business needs to survive on its own, a dispute that caused the steel division's leadership to resign at the end of August.


($1 = 0.9108 euros)



Reporting by Ludwig Burger, Christoph Steitz, Markus Wacket and Tom Kaeckenhoff; Editing by Sherry Jacob-Phillips, Alexander Smith and Susan Fenton

</body></html>

免责声明: XM Group仅提供在线交易平台的执行服务和访问权限,并允许个人查看和/或使用网站或网站所提供的内容,但无意进行任何更改或扩展,也不会更改或扩展其服务和访问权限。所有访问和使用权限,将受下列条款与条例约束:(i) 条款与条例;(ii) 风险提示;以及(iii) 完整免责声明。请注意,网站所提供的所有讯息,仅限一般资讯用途。此外,XM所有在线交易平台的内容并不构成,也不能被用于任何未经授权的金融市场交易邀约和/或邀请。金融市场交易对于您的投资资本含有重大风险。

所有在线交易平台所发布的资料,仅适用于教育/资讯类用途,不包含也不应被视为用于金融、投资税或交易相关咨询和建议,或是交易价格纪录,或是任何金融商品或非应邀途径的金融相关优惠的交易邀约或邀请。

本网站上由XM和第三方供应商所提供的所有内容,包括意见、新闻、研究、分析、价格、其他资讯和第三方网站链接,皆保持不变,并作为一般市场评论所提供,而非投资性建议。所有在线交易平台所发布的资料,仅适用于教育/资讯类用途,不包含也不应被视为适用于金融、投资税或交易相关咨询和建议,或是交易价格纪录,或是任何金融商品或非应邀途径的金融相关优惠的交易邀约或邀请。请确保您已阅读并完全理解,XM非独立投资研究提示和风险提示相关资讯,更多详情请点击 这里

风险提示: 您的资金存在风险。杠杆商品并不适合所有客户。请详细阅读我们的风险声明